Q3 2026 adj. EBITDA (guided)
~$575M
vs. $286M in Q2; Cleveland-Cliffs Q2 2026 earnings release, Jul 23, 2026
HRC spot, Oct 19, 2026
$1,356/ton
+67% YoY, +2.49% MoM; Trading Economics, Oct 19, 2026
Iron ore spot, Oct 19, 2026
$105.14/ton
Highest since January 2026; Trading Economics, Oct 19, 2026
CLF long-term debt (Jun 30, 2026)
$7.70B
Net debt $7.63B; Cleveland-Cliffs 10-Q for Q2 2026, filed Jul 23, 2026
Section 232 steel tariff
50%
In effect since June 2025; White House Fact Sheet, Apr 2, 2026
DR-grade iron-ore pellet premium
$38/ton
Quarterly contract; Fastmarkets, Oct 1, 2026
Implied options move on Oct 19
±12.1%
10-yr avg ±11.8%; Earnings-Watcher, as of Oct 16, 2026
What Today's Print Has to Confirm
Cleveland-Cliffs reports Q3 2026 before U.S. markets open on October 19, guided to roughly $575M of adjusted EBITDA — more than double the $286M it actually booked in Q2 and four times the $143M it printed in Q3 2025. Management tied the step-up to about $55 per net ton of higher flat-rolled pricing and roughly 300,000 additional net tons of shipments, both of which are now visible in the tape: hot-rolled coil traded at $1,356/ton on the morning of the print, up 67% YoY, and Cleveland-Cliffs's own Q2 average net selling price had already moved to $1,124/ton, up 10.7% YoY.
- Q3 adjusted EBITDA — guided at ~$575M, more than double the $286M actual in Q2 2026.
- Flat-rolled pricing — guidance assumes +~$55/ton over Q2's $1,124 average, putting implied Q3 around $1,179/ton.
- Steel shipments — guidance assumes +~300k net tons over Q2's 4.0M, pointing to ~4.3M net tons in Q3.
- Customer mix exposure — Q2 2026 revenue split was 33% distributors/converters, 29% auto direct, 28% infrastructure/manufacturing; the AI/data-center pull hits the third bucket most directly.
- Stelco wrinkle — Cleveland-Cliffs announced on September 28, 2026 it would idle output at Stelco's Hamilton mill citing US tariffs; any Q3 restructuring charge or loss-of-output commentary will color the print.
Cleveland-Cliffs quarterly adjusted EBITDA, $M
Q3 2026 reflects company guidance from the Q2 2026 release; Q4 2026 shown as a qualitative 'outperform' band.
Unit: $M
Q3 2025A
Cleveland-Cliffs Q3 2025 release, Oct 20, 2025
143
Q4 2025A
Cleveland-Cliffs Q4 2025 release, Feb 9, 2026
-15
Q1 2026A
Cleveland-Cliffs Q1 2026 release, Apr 20, 2026
95
Q2 2026A
Cleveland-Cliffs Q2 2026 release, Jul 23, 2026
286
Q3 2026E
Cleveland-Cliffs Q2 2026 guidance, Jul 23, 2026
575
Q4 2026E
'expected to outperform Q3', Cleveland-Cliffs Q2 2026 release
600
Transformer Steel Is the One AI Pull Cleveland-Cliffs Actually Captures
Of the demand vectors inside the Q3 print, Grain-Oriented Electrical Steel — the specialty grade that goes into transformer cores and is the one commodity inside Cleveland-Cliffs's portfolio that no other US-listed producer supplies at scale — is the cleanest read-through to AI/data-center buildout. A 2025 industry assessment identified Cleveland-Cliffs as the only major domestic supplier of GOES, a bottleneck the 50% Section 232 tariff now protects from import substitution.
- Hitachi Energy's $457M South Boston, Virginia transformer plant — broke ground June 29, 2026 with about 825 new jobs; explicitly framed to 'support transmission, generation, data centers'.
- Cleveland-Cliffs's $200M Butler Works GOES expansion — $75M U.S. Department of Energy award; toured on October 6 by Secretary of Energy Chris Wright.
- Cleveland-Cliffs's $1B Middletown Works modernization — $500M DOE award announced August 21, 2026; includes two new electric melting furnaces aimed at higher-grade and electrical steel.
- Weirton, West Virginia transformer plant — the $150M repurposing of the former tinplate site was cancelled earlier in the cycle; Cleveland-Cliffs has consolidated its downstream capex into Butler and Middletown instead.
Capital deployed along the transformer-steel chain, 2026
Hitachi Energy, South Boston VA
$457M
Largest US large-power-transformer facility; ground broken Jun 29, 2026
Cleveland-Cliffs Butler Works GOES expansion
$200M
$75M DOE award; toured by Sec. Wright Oct 6, 2026
Cleveland-Cliffs Middletown Works
$1.0B
$500M DOE award; announced Aug 21, 2026
Cleveland-Cliffs Weirton transformer plant
$150M
Project cancelled; capital reallocated
Total visible transformer-grade capex
~$1.66B
Combined private + federal, 2026
The Debt Stack Is the Reason the Stock Doesn't Re-Rate
The flat-rolled pricing tailwinds flowing through Q3 land on a balance sheet that is the structural mirror image of Nucor's and Steel Dynamics's. Cleveland-Cliffs carries $7.70B of long-term debt and just $70M of cash on June 30, 2026, against trailing-twelve-month EBITDA of $546M — a net-leverage ratio near 14x. Nucor and Steel Dynamics sit at 0.8x and 1.2x respectively, which is why their forward P/Es (11.4x and 10.0x) are inside a normal range while Cleveland-Cliffs's trailing P/E is negative and its EV/EBITDA is 26.6x on depressed TTM EBITDA.
| Metric | Cleveland-Cliffs | Nucor | Steel Dynamics |
|---|---|---|---|
| Process route | BF/BOF (integrated) | EAF (scrap + DRI) | EAF (scrap) |
| Price (Oct 16, 2026) | $12.12 | $256.29 | $240.54 |
| Market cap | $6.9B | $58.1B | $34.5B |
| LTM revenue | $19.2B | $36.1B | $20.5B |
| LTM EBITDA | $546M | $5.68B | $2.67B |
| Net debt / EBITDA, TTM | ~14.0x | 0.80x | 1.21x |
| EV / EBITDA, TTM | 26.6x | 10.9x | 12.8x |
| Forward P/E | 16.0x | 11.4x | 10.0x |
| Q3 2026 guide (EPS) | EBITDA ~$575M | $5.55–$5.65 | $5.34–$5.38 |
| Earnings date | Oct 19, 2026 | Oct 26, 2026 | Oct 20, 2026 |
The investor takeaway from the spread is that the AI-steel demand thesis is asymmetric by balance-sheet quality. Nucor and Steel Dynamics get a cleaner read on flat-rolled price recovery without the leverage drag, and their Q3 prints — Steel Dynamics on October 20 and Nucor on October 26 — will be the easier comparables to read. Cleveland-Cliffs is the only one of the three with material GOES exposure, and that is the captive piece of the story the broader EAF comp set cannot replicate.
What Could Break the Thesis Before Q4
- Iron-ore cost squeeze — Iron ore at $105.14/ton sits at its highest since January 2026, and Cleveland-Cliffs's integrated mills cannot substitute toward scrap the way Nucor's EAFs can.
- Tariff-policy reversal risk — The 50% Section 232 rate that underpins the domestic pricing premium is an executive-branch lever, not statute; any rollback ahead of the 2027 election cycle collapses CLF's floor in a single quarter.
- Stelco restructuring math — The September 28, 2026 idling of Stelco's Hamilton mill is a Q3 event; depending on the size of any impairment or severance charge, headline GAAP net loss can diverge sharply from the $575M adjusted EBITDA guide.
- Auto-cycle softness — Q2 2026's 29% direct-automotive revenue share is the lever least tied to AI/grid demand; any U.S. auto production cut into year-end pulls volume guidance lower.
- Capex absorption — Middletown's $1B and Butler's $200M both peak spending in 2026–2027 just as the cycle rolls; free cash flow was just $73M in Q2, leaving little buffer for any pricing reversal.
Investable read-through from the Q3 print
- Q3 2026 guide of ~$575M adj. EBITDA on $1,124/ton Q2 base implies a +~$55/ton pricing acceleration and +~300k net ton volume bump, putting Q3 net selling price near $1,179/ton.
- Cathai-Cliffs (note: company) is the only major domestic GOES supplier, so the $1.66B of transformer-grade capex in 2026 (Hitachi, Butler, Middletown) feeds directly into the captive franchise.
- Bull-bear is balance sheet: ~14x net leverage on $7.70B of long-term debt versus $546M of TTM EBITDA caps the stock until four more quarters of print like today's.
- Stelco's September 28, 2026 Hamilton idling is in the Q3 print and will show up as either a restructuring gain (capacity cleaned out) or a GAAP charge — read the segment disclosures before reacting to the headline number.
- Q3 2026 guidance of $5.55–$5.65 per diluted share, vs. consensus $5.89–$6.17, was set against a backdrop of HRC up 67% YoY — Nucor prints October 26 and should be the cleanest read on a sustained flat-rolled rally.
- EAF economics shield Nucor from the iron-ore spike ($105.14/ton at multi-month highs) and let it run richer scrap-based utilization at higher realized prices.
- 0.80x net leverage and a 10.9x EV/EBITDA — versus Cleveland-Cliffs's 14.0x and 26.6x — is the structural reason the AI-steel trade is more efficient through Nucor than through the integrated comp.
- Q3 2026 guidance of $5.34–$5.38 per diluted share, more than 50% above the $2.74 reported in Q3 2025, is the first hint that the EAF flat-rolled comp is also riding the HRC +67% YoY trend.
- Steel Dynamics prints October 20 — the day after Cleveland-Cliffs — so its comp read-out will move the perceived AI-data-center demand narrative within 24 hours.
- 1.21x net leverage and an SBQ/fabrication backlog disclosure give Steel Dynamics the cleanest non-residential construction exposure of the three comps.
- Grid equipment demand is the mirror image of Cleveland-Cliffs's GOES pull — every large-power transformer Hitachi Energy ships out of the new South Boston plant is also a GE Vernova-addressable sale.
- U.S. data-center power demand projected to grow from 176 TWh in 2023 to 325–580 TWh by 2030 (Belfer Center, Feb 10, 2026), which is the demand backdrop that supports GE Vernova order growth through 2027.
- Distribution-transformer capacity additions are the conversion layer of the same GOES demand that drives Cleveland-Cliffs — Hubbell is the most direct US-listed manufacturer on that end-market.
- Operating margin of 11.5% LTM and 1.81x financial leverage give Hubbell room to fund transformer capacity expansion as utilities and data-center developers lock in long-cycle orders.